Not sure if this is intended or not, but power consumption change by under-clocking/over-clocking needs a certain time to be effective.
If power network shutdown happens, under-clocking a building does not lower power consumption immediately and it causes power network shutdown again after recovering.
To avoid this, I need to under-clock the building, turn it off, restart power network, then turn it on.